City of santa barbara stormwater bmp guidance manual






















provides guidance for designing LID or “green” parking lots. The amount of • The Low Impact Development Manual for Southern California: Technical Guidance and Site Planning Strategies • City of Santa Barbara: Storm Water BMP Guidance Manual. Construction Site Monitoring Program Guidance Manual August (PDF) Description: This manual presents guidance for Caltrans staff and contractors to use in the planning and implementation of stormwater monitoring programs at construction sites, in compliance with: Construction General Permit, Order No. DWQ, National Pollutant Discharge . the Storm Water BMP Guidance Manual, pursuant to Santa Barbara Municipal Code Chapter treatment, rate and volume. The Owner shall submit a hydrology report prepared by a registered civil engineer or licensed architect demonstrating that the new development will comply with the City’s Storm Water BMP Guidance Manual.


the BMP Guidance Manual ( (e)), which may be amended by the Directors of Community Development, Public Works, and Environmental Services. In addition, Section requires minimum control measures for all. Storm Water Management Program. The files linked on this page are in PDF format. Guidance Document for Municipal Stormwater Permit (current program). As of , under NPDES Municipal General Permit for Small MS4s (Order no. DWQ) Project Clean Water Annual Reports are found on the State Water Resources Control Board SMARTS database. For volume based BMP, retain and treat the 1-inch, hr storm. For flow based BMP, size for rainfall of in/hr for 4 hrs. For more details, see Chapter 6 of the City’s Storm Water BMP Guidance Manual Basic Storm Water Best Management Practices (BMP) Requirements See Chapter 5 of the City’s Storm Water BMP Guidance Manual.


The UCSB Stormwater Management Program Guidance Document will serve as a Located along the coast of Santa Barbara County, UCSB is not only unique. 1 de out. de City of Santa Barbara. Storm Water BMP Guidance Manual. Clear Creek Solutions, Inc. San Diego Hydrology Model User Manual. 12 de out. de Quantitative BMP Model Approach for Santa Barbara County SBPAT User's Guide (Geosyntec, ) contains additional detail on the datasets.

0コメント

  • 1000 / 1000