Clack valves manuals






















Clack WS TT Duplex Regenerating Systems Including: Softener Crystal Right (I ron Manganese Removal) Nitrate Removal Colour Removal (O rganic Scavenger) Manual 2 Contents 1. Unpacking Instructions 2. Installation Pre-installation checks Fitting the distribution systems Adding the media Fitting the valves Brine tank connections Duplex. Prior to starting the programming steps, connect the interconnect cable to each control valve board’s three pin connector labeled “INTERCONNECT”. Also connect the meter cord to either control valve to the three pin connector labeled “METER”. Softener valve programming steps OEM cycle sequence Step 4C Set to ALT A Connect ALT A valve to the MAV’s A port and connect the MAV’s two pin wire connector . Only use Clack No Hard Water Bypass Valves or Clack Motorized Alternating Valves (MAV) with these selections. Clack No Hard Water Bypass Valves (1” or ” VFF or VFM) are not designed to be used with the alternator or separate source functions. Step 5CS Selecting the Control Valve to .


” Control Valve Series Model: WS Operation and Instruction Manual for OEM Only. Please Note: This operation and instruction manual is for the training of the OEM and for the OEM to use to train their customers. This document is not to be used as the complete system manual. Clack Corporation Duraform Lane, Windsor, WI Ph. * Clack Documentation = www.doorway.ru Download Clack Valve Service Manuals from Clack Corporation's website. Clack Valve Reference Guide Web Link. Trouble Shooting Guide for WS1 and WS2. WS1 TC 3 button Service Manual. Programming and Cover Drawing Manual. The control valve offers multiple procedures that allow the valve to be modifi ed to suit the needs of the installation. These procedures are: • OEM Cycle Sequence • OEM Softener System Setup • OEM Filter System Setup • Installer Display Settings • User Display Settings • Diagnostics • Valve History.


See software-specific Programming and Front Cover Manual CLACK WATER METERS SHOULD NOT BE USED AS THE PRIMARY MONITORING DEVICE FOR CRITICAL OR. programming the valve section page 7). However, running a manual regeneration during commissioning is the best way of removing air from the softener. Refer to Control Valve Service Manual for other drawings and part numbers. Only use Clack No Hard Water Bypass Valves or Clack Motorized Alternating.

0コメント

  • 1000 / 1000